Trading Off between Heijunka and Just-in-Sequence
Détails
ID Serval
serval:BIB_F0DB2BF36B03
Type
Article: article d'un périodique ou d'un magazine.
Collection
Publications
Institution
Titre
Trading Off between Heijunka and Just-in-Sequence
Périodique
International Journal of Production Economics
ISSN
0925-5273
Statut éditorial
Publié
Date de publication
04/2009
Peer-reviewed
Oui
Volume
118
Numéro
2
Pages
501-507
Langue
anglais
Résumé
The concept of heijunka-controlling the variability of the job arrival sequence to permit higher capacity utilization-plays an integral role in lean production theory. In situations where the customer defines the delivery sequence, however, scheduling production to maximize utilization becomes more challenging and requires a subsequent reordering. The cost of the extra work and space required by this reordering needs to be traded off against the value of the higher utilization. We present the results of a stylized simulation-based model of the two approaches inspired by a BMW engine plant.
Mots-clé
Just in sequence, Heijunka, Lean production, Simulation, Scheduling
Web of science
Création de la notice
28/05/2009 11:26
Dernière modification de la notice
20/08/2019 16:18